Register now and get a USD $ 5.00 off coupon
1.Install the drill, before installing, pls choose the proper electric drill, generally the dimension of hole on the ceiling would be 6mm, we had better choose the proper electric drill, then we could install the pendant lights.
2. Find the installation hole on the ceiling base, at first take the hanging plate off the ceiling base, then use the screw to install the ceiling plate, we could adjust the position of screw according to the situation.
3. After confirming the installation hole, then we could drill holes, please be careful for the depth of hole, it would not be over 6mm.
4. Next , insert the expansion screw into the installation hole, and use the hammer to knock it to keep fixed, which is in avoid of falling down after finishing installation and usage.
5. Fix the hanging plate, and put the expansion screw into the wall, then fix the hanging plate, when we install the hanging plate, we had better fix the hanging plate tightly and not keep the screw off set.
6. Then we can go on fixing the ceiling plate and fixture, we can connect the hanging plate to ceiling base by the screw, after finishing the screws, we can fix the ceiling plate, of course ensures the ceiling base solid.
7. Finally we can install the shade, besides other process, it is simple to install the fixture shade, but we still need to keep the accessories not fall down, at the same time, in order to keep the chandelier completed, we have to ensure that surface don’t have any scratch, wrap and other damage, it is very important to keep it decorative.